Installed within hours...

Urbin underground front-load container

A few hours is all that is need for an Urbin front-load underground container "drop-in" installation:

  1. Excavation
  2. Gravel footing preparation
  3. Concrete insert positionning (with crane)
  4. Fine position adjustment
  5. Refill and landscaping
  • Excavation

    Excavation.

  • Préparation de la fondation de gravier

    Gravel footing preparation.

  • Positionnement de la base (avec grue)

    Concrete insert positionning (with crane).

  • Vérification du positionnement

    Position adjustment

  • Remblai et finition

    Refill and landscaping.

Urbin underground crane-collected container

Unlike our competitor's models, our double layered wall will not bend, buckle or collapse due to the pressures of refilling and compacting the surrounding soil. Or "drop-in" installation is just as fast as for our front load container.

  1. Excavation
  2. Gravel footing preparation
  3. Container positionning (with crane)
  4. Fine position adjustment
  5. Refill and landscaping
  • Excavation

    Excavation.

  • Préparation de la fondation de gravier

    Gravel footing preparation.

  • Positionnement du contenant (avec grue)

    Container positionning (with crane).

  • Vérification du positionnement

    Fine position adjustment.

  • Remblai et finition

    Refill and landscaping.