Unlike other models on the market, the double wall of our crane-loaded container will not deform under soil pressure during installation (backfill and compaction). The installation is just as quick as front loading.
- Excavation
- Preparation of the gravel foundation
- Positioning of the base (with crane)
- Positioning verification
- Backfill and finishing